Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Aflatoxins
Cumulative sum
Error sum of squares
Fixed cost contract
Fixed price
Fixed price contract
Fixed-cost contract
Fixed-price contract
Interim lump sum maintenance
Interim lump sum support
Interlocutory lump sum maintenance
Interlocutory lump sum support
Lump sum
Lump sum contract
Lump sum interim maintenance
Lump sum interim support
Lump sum interlocutory maintenance
Lump sum interlocutory support
Lump-sum contract
Lump-sum payment for support
Lump-sum refund
Lump-sum reimbursement
Lump-sum welfare payment
PSELFEXT
PSFEXT
Power sum ELFEXT
Power sum FEXT
Power sum equal level far-end crosstalk
Power sum far-end crosstalk
Quadratic sum of deviations
RSS
Refund in a lump sum
Residual sum of squares
Stipulated price contract
Stipulated sum contract
Stipulated-price contract
Stipulated-sum contract
Sum of deviations
Sum of individual aflatoxins B 1 + B 2 + G 1 + G 2
Sum of residual squares
Sum of squares of deviations

Übersetzung für "Sum deviations " (Englisch → Französisch) :

TERMINOLOGIE
cumulative sum | sum of deviations

cumul des écarts de prévision | cumul des écarts


quadratic sum of deviations

somme quadratique des écarts


sum of squares of deviations

somme des carrés résiduels


interim lump sum maintenance [ interim lump sum support | interlocutory lump sum maintenance | interlocutory lump sum support | lump sum interim maintenance | lump sum interim support | lump sum interlocutory maintenance | lump sum interlocutory support ]

prestation alimentaire forfaitaire interlocutoire [ prestation alimentaire forfaitaire provisoire ]


fixed price contract | fixed-price contract | lump sum contract | lump-sum contract | fixed price | lump sum | stipulated price contract | stipulated-price contract | stipulated sum contract | stipulated-sum contract | fixed cost contract | fixed-cost contract

contrat à forfait | contrat à prix fixe | forfait | marché à forfait | marché à prix fixe | contrat à prix forfaitaire | marché à prix forfaitaire | contrat forfaitaire | marché forfaitaire | travail à forfait


power sum equal level far-end crosstalk | PSELFEXT | power sum ELFEXT | power sum far-end crosstalk | power sum FEXT | PSFEXT

télédiaphonie cumulée | télédiaphonie cumulée à niveau égal | diaphonie éloignée cumulée | diaphonie distante cumulée | diaphonie éloignée cumulée à niveau égal | diaphonie distante cumulée à niveau égal | écart télédiaphonique cumulé


lump-sum refund | lump-sum reimbursement | refund in a lump sum

remboursement forfaitaire


error sum of squares | residual sum of squares | sum of residual squares | RSS [Abbr.]

somme des carrés des erreurs | somme des carrés des résidus | somme des carrés résiduelle


sum of individual aflatoxins B 1 + B 2 + G 1 + G 2 (1) | sum of aflatoxins B1, B2, G1, G2 (2) | aflatoxins (sum of B1+B2+G1+G2)

aflatoxines (somme de B1+B2+G1+G2)


lump-sum payment for support | lump-sum welfare payment

forfait d'assistance
IN-CONTEXT TRANSLATIONS
across all bidding zones, taking into account, where appropriate, allocation constraints, there are no deviations between the sum of energy transferred out of all surplus bidding zones and the sum of energy transferred into all deficit bidding zones;

au regard de l'ensemble des zones de dépôt des offres, compte tenu, le cas échéant, des contraintes d'allocation, il n'y ait pas d'écart entre la somme des volumes d'énergie transférés en dehors de l'ensemble des zones de marché excédentaires et la somme des volumes d'énergie transférés à l'intérieur de l'ensemble des zones de marché déficitaires;


(22) If the retroreflective sheeting referred to in S5.7.1.2 of TSD 108 is applied to a non-vertical surface, the entrance angle used to demonstrate that the sheeting conforms to the photometric requirements prescribed by that section shall be the sum of the entrance angle specified in column 1 of Figure 29 of TSD 108 and the angle, measured at the horizontal centreline of the sheeting, by which the sheeting deviates from the vertical.

(22) Lorsque le matériau rétroréfléchissant visé à la disposition S5.7.1.2 du DNT 108 est apposé sur une surface non verticale, l’angle d’éclairage utilisé pour démontrer la conformité du matériau avec les exigences photométriques prévues à cette disposition doit être égal à la somme de l’angle d’éclairage spécifié dans la première colonne de la figure 29 du DNT 108 et de l’angle, mesuré sur l’axe horizontal du matériau, entre la verticale et le matériau.


(10) If reflective material referred to in S5.1.1.4 of TSD 108 is applied to a non-vertical surface, the entrance angle used to demonstrate that the material conforms to the performance standards prescribed by that section shall be the sum of the entrance angle specified in Table 1 or Table 1A of SAE Standard J594f, Reflex Reflectors (January 1977), and the angle, measured on the horizontal centreline of the material, by which the material deviates from the vertical.

(10) Lorsqu’un matériau réfléchissant visé à la disposition S5.1.1.4 du DNT 108 est installé sur une surface non verticale, l’angle d’éclairage utilisé pour démontrer la conformité du matériau avec les normes d’efficacité prévues à cette disposition doit être est égal à la somme de l’angle d’éclairage spécifié aux tableaux 1 ou 1A de la norme J594f de la SAE, intitulée Reflex Reflectors (janvier 1977), et de l’angle, mesuré sur l’axe horizontal du matériau, entre la verticale et le matériau.


2.1.2. For instruments where the fill may be made up from more than one load (e.g. cumulative or selective combination weighers) the MPE for static loads shall be the accuracy required for the fill as specified in point 2.2 (i.e. not the sum of the maximum permissible deviation for the individual loads).

2.1.2. Pour les instruments pour lesquels le remplissage peut comporter plus d'une charge (ex. instruments à combinaisons cumulatives ou associations), l'erreur maximale tolérée pour les charges statiques est l'exactitude requise pour le remplissage telle qu'indiquée au point 2.2 (et non la somme des écarts maximaux admissibles pour les charges individuelles).


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
The question for resolution on this appeal can be summed up in one sentence: to what extent, if at all, does the right to vote enshrined in the Charter permit deviation from the " one person - one vote" rule?

On peut résumer en une phrase la question à résoudre en l'espèce: dans quelle mesure, s'il en est, le droit de vote consacré par la Charte permet-il de s'écarter de la règle « une personne, une voix »?


2.1.2. For instruments where the fill may be made up from more than one load (e.g. cumulative or selective combination weighers) the MPE for static loads shall be the accuracy required for the fill as specified in 2.2 (i.e. not the sum of the maximum permissible deviation for the individual loads).

2.1.2. Pour les instruments pour lesquels le remplissage peut comporter plus d'une charge (ex. instruments à combinaisons cumulatives ou associations), l'erreur maximale tolérée pour les charges statiques est l'exactitude requise pour le remplissage telle qu'indiquée au point 2.2 (et non la somme des écarts maximums admissibles pour les charges individuelles).


4. For each sample the sum of the standardized deviations to the limit is calculated using the following formula:

4. Pour chaque échantillon, la somme des écarts réduits par rapport à la limite est calculée au moyen de la formule suivante:


2.3.1.3. each displacement corresponding to each deviation does not exceed 35 mm of the deflection, and the sum of these displacements does not exceed 70 mm (see Figure 2) and

2.3.1.3. la course correspondant à tout écart ne s'écarte pas de l'enfoncement de plus de 35 mm et que la somme de ces courses ne dépasse pas 70 mm (voir la figure 2);


2.3.1.4. the sum of the energy derived from deviating outside the corridor does not exceed 5 % of the gross energy for that block.

2.3.1.4. le total de l'énergie correspondant à la sortie du couloir ne dépasse pas 5 % de l'énergie totale relative à ce bloc.


4. Compute for the sample the test statistic quantifying the sum of the standard deviations from the limit and defined as:

4. On calcule pour l'échantillon la statistique de test représentant la somme des écarts réduits à la limite et définie par:


w