Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Engineer equipment resupply point
Engr eqpt resup pt
Unit eqpt resup pt
Unit equipment resupply point

Übersetzung für "Engineer equipment resupply point " (Englisch → Deutsch) :

TERMINOLOGIE
engineer equipment resupply point [ engr eqpt resup pt ]

Nachschubpunkt Geniematerial [ Ns Pt G Mat ]


unit equipment resupply point [ unit eqpt resup pt ]

Nachschubpunkt Korpsmaterial [ Ns Pt Korpsmat ]
IN-CONTEXT TRANSLATIONS
The engines indicated in point (a) of Article 16(4) equipped with a complete emissions control system, including the replacement pollution control device of the type for which approval is requested, shall be subjected to tests appropriate for the intended application as described in Annex 4 to UNECE Regulation No 49, in order to compare its performance with the original emissions control system in accordance with the procedure described in points 4.3.1.1 and 4.3.1.2’.

Die in Artikel 16 Absatz 4 Buchstabe a angegebenen Motoren mit einem vollständigen Emissionsminderungssystem einschließlich der emissionsmindernden Einrichtung für den Austausch des Typs, für den die Genehmigung beantragt wird, sind Prüfungen zu unterziehen, die für den Verwendungszweck gemäß Anhang 4 der UNECE-Regelung Nr. 49 angemessen sind, um ihre Leistung mit dem Original-Emissionsminderungssystem gemäß dem in den Nummern 4.3.1.1 und 4.3.1.2 beschriebenen Verfahren zu vergleichen.“


As an alternative to point 4.6.6, the electrical power to the PEMS system may be supplied by the internal electrical system of the vehicle as long as the power demand for the test equipment does not increase the output from the engine by more than 1 % of its maximum power and measures are taken to prevent excessive discharge of the battery when the engine is not running or idling.

Alternativ zu Nummer 4.6.6 kann die Stromzufuhr des PEMS-Systems durch die elektrische Anlage des Fahrzeugs erfolgen, solange der Leistungsbedarf der Prüfausrüstung die Motorleistung um höchstens 1 % der maximalen Leistung ansteigen lässt und Maßnahmen getroffen werden, mit denen eine übermäßige Entladung der Batterie verhindert wird, solange der Motor nicht läuft oder im Leerlauf läuft.


The engines indicated in point (a) of Article 16(4) equipped with a complete emissions control system, including the replacement pollution control device of the type for which approval is requested, shall be subjected to tests appropriate for the intended application as described in Annex 4 to UNECE Regulation No 49, in order to compare its performance with the original emissions control system in accordance with the procedure described in points 4.3.1.1 and 4.3.1.2’.

Die in Artikel 16 Absatz 4 Buchstabe a angegebenen Motoren mit einem vollständigen Emissionsminderungssystem einschließlich der emissionsmindernden Einrichtung für den Austausch des Typs, für den die Genehmigung beantragt wird, sind Prüfungen zu unterziehen, die für den Verwendungszweck gemäß Anhang 4 der UNECE-Regelung Nr. 49 angemessen sind, um ihre Leistung mit dem Original-Emissionsminderungssystem gemäß dem in den Nummern 4.3.1.1 und 4.3.1.2 beschriebenen Verfahren zu vergleichen.“


4.1.7. If auxiliary equipment is supplied with energy from the same reserve as the electric control transmission, it shall be ensured that, with the engine running at a speed not greater than 80 % of the maximum power speed, the supply of energy is sufficient to fulfil the prescribed deceleration values by either provision of an energy supply which is able to prevent discharge of this reserve when all auxiliary equipment is functio ...[+++]

4.1.7. Werden die Nebenverbraucher mit Energie aus demselben Speicher wie die elektrische Steuer-Übertragungseinrichtung versorgt, dann muss sichergestellt sein, dass bei einer Motordrehzahl von nicht mehr als 80 % der Drehzahl bei Höchstleistung die Energieversorgung ausreicht, um die vorgeschriebenen Verzögerungswerte zu erfüllen. Dies wird dadurch erreicht, dass entweder die zugeführte Energiemenge so bemessen ist, dass dieser Energiespeicher nicht entladen wird, wenn alle Nebenverbraucher in Betrieb sind, oder vorher ausgewählte Nebenverbraucher bei einer Spannung über dem kritischen Wert nach Nummer 4.1.6 automatisch abgeschaltet we ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
the NRSC (non-road steady cycle) appropriate for the equipment specification which shall be used for the measurement of the emissions of carbon monoxide, hydrocarbons, oxides of nitrogen and particulates for stages I, II, IIIA, IIIB and IV of engines described in points (i) and (ii) of section 1.A of Annex I, and

der NRSC-Zyklus (stationärer Test für mobile Maschinen und Geräte), der zur Ermittlung der Emissionen von Kohlenstoffmonoxid, Kohlenwasserstoffen, Stickstoffoxiden und Partikeln für die Stufen I, II, III A, III B und IV bei den Motoren nach Anhang I Abschnitt 1.A Ziffern i und ii verwendet wird, und


‘9. By way of derogation, the dates set out in points (d) and (e) of paragraph 2 and in paragraph 3 shall, for tractors of categories T2, T4.1 and C2, as defined respectively in the second indent of point A.1 of Chapter A, in point 1.1 of Part I of Appendix 1 of Chapter B, and in point A.2 of Chapter A of Annex II to Directive 2003/37/EC, and equipped with engines of categories L to R, be postponed for 3 years.

„(9) Abweichend von Absatz 2 Buchstaben d und e sowie von Absatz 3 werden die dort genannten Termine für Zugmaschinen der Kategorien T2, T4.1 und C2, die in Anhang II Kapitel A Nummer A.1 zweiter Gedankenstrich, Anhang II Kapitel B Anlage 1 Teil I Nummer 1.1 beziehungsweise Anhang II Kapitel A Nummer A.2 der Richtlinie 2003/37/EG definiert und mit Motoren der Kategorien L bis R ausgerüstet sind, um drei Jahre verschoben.


The track, points, engineering structures (bridges, tunnels, etc.), associated station infrastructure (platforms, zones of access, including the needs of persons with reduced mobility, etc.), safety and protective equipment.

Gleise, Weichen, Kunstbauten (Brücken, Tunnel usw.), zugehörige Infrastruktur in den Bahnhöfen (Bahnsteige, Zugangsbereiche unter Berücksichtigung der Bedürfnisse von Personen mit eingeschränkter Mobilität usw.), Sicherheits- und Schutzausrüstung.


[39] According to point 11.1 of Annex I to the draft amendment the type-approval can be extended to vehicles from the same type or from a different type differing with regard to the characteristics reference mass, maximum authorised mass, overall gear ratios and engine equipment and accessories, if the CO2 emissions measured by the technical service do not exceed by more than 6 % for vehicles of category N1 the type-approval value

[39] Gemäß Punkt 11.1 des Anhangs zum Änderungsentwurf kann die Typgenehmigung auf Fahrzeuge des gleichen Typs oder eines anderen Typs ausgedehnt werden, bei dem Abweichungen in Bezug auf Masse, höchstzulässige Masse, Gesamtübersetzungsverhältnisse, Motorausrüstung und Nebenaggregate gegeben sind, wenn die vom technischen Dienst gemessenen CO2-Emissionen den Typgenehmigungs wert um nicht mehr als 6 % übersteigen:


(2) For the purpose of the demonstration test of vehicles equipped with positive-ignition engines, when the HC value measured under point 6.2.1 of this Annex is higher than the value measured during type approval of the vehicle, the difference has to be added to the threshold values mentioned in point 3.3.2 of Annex XI, to which the excedence allowed in point 1 of Appendix 1 to Annex XI is applied.

(2) Für den Zweck von Demonstrationstests von Kraftfahrzeugen mit Fremdzündungsmotoren muss, wenn der gemäß Nummer 6.2.1 dieses Anhangs gemessene HC-Wert den während der Typgenehmigungsprüfung des Fahrzeugs gemessenen Wert überschreitet, die Differenz zu den unter Nummer 3.3.2 des Anhangs XI genannten Schwellenwerten addiert werden, auf die die gemäß Anhang XI, Anlage 1 Nummer 1 zulässige Überschreitung Anwendung findet.


The track, points, engineering structures (bridges, tunnels, etc.), associated station infrastructure (platforms, zones of access, including the needs of persons with reduced mobility, etc.), safety and protective equipment.

Gleise, Weichen, Kunstbauten (Brücken, Tunnel usw.), zugehörige Infrastruktur in den Bahnhöfen (Bahnsteige, Zugangsbereiche unter Berücksichtigung der Bedürfnisse von Personen mit eingeschränkter Mobilität usw.), Sicherheits- und Schutzausrüstung.




datacenter (1): www.wordscope.de (v4.0.br)

'Engineer equipment resupply point' ->

Date index: 2023-08-13
w