Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Control mine planning activities
Detention basin
Execute airport snow control plan
Execute airport winter operations plan
Flood
Flood control
Flood control plan
Flood control reservoir
Flood control structure
Flood control works
Flood defence
Flood defence structure
Flood detention basin
Flood mitigation
Flood mitigation reservoir
Flood mitigation scheme
Flood mitigation works
Flood protection
Flood protection plan
Flood protection scheme
Flood protection structure
Flood protection works
Flood retention basin
Flood storage reservoir
Flood-damage mitigation
Flood-mitigation reservoir
Flood-mitigation works
Flood-retarding basin
Follow airport snow control plan
Follow airport winter operations plans
Mine planning activities control
Oversee mine planning activities
Overseeing of mine planning activities
Remove snow from airport operational areas
Retarding basin

Übersetzung für "Flood control plan " (Englisch → Deutsch) :

TERMINOLOGIE
flood protection scheme | flood mitigation scheme | flood protection plan | flood control plan

Hochwasserschutzkonzept


flood control structure | flood control works | flood defence | flood defence structure | flood protection works | flood-mitigation works

Hochwasserschutzbaute | Schutzwasserbaute | Werk des Hochwasserschutzes


flood control reservoir | flood detention basin | flood retention basin | flood-mitigation reservoir | flood-retarding basin | retarding basin

Hochwasserrückhaltebecken | Retentionsbecken | Rückhaltebecken


flood control | flood defence | flood mitigation | flood protection | flood-damage mitigation

Hochwasserschutz


flood protection structure | flood control structure | flood defence structure | flood protection works | flood control works | flood mitigation works

Hochwasserschutzbauwerk | Hochwasserschutzbaute | Schutzwasserbaute


flood control reservoir | flood mitigation reservoir | flood storage reservoir | flood-retarding basin | retarding basin | flood retention basin | flood detention basin | detention basin

Hochwasserrückhaltebecken | Rückhaltebecken | Retentionsbecken


flood [ flood control(UNBIS) ]

Überschwemmung [ Hochwasser | Überflutung ]


control mine planning activities | overseeing of mine planning activities | mine planning activities control | oversee mine planning activities

Grubenplanung überwachen


execute airport snow control plan | execute airport winter operations plan | follow airport snow control plan | follow airport winter operations plans

Winterdienstplan für den Flughafen befolgen


remove snow from operational and traffic areas in accordance with airport snow control plan | undertake snow and ice removal activities in airport operational and traffic areas | implement snow removal procedures according to airport snow control plan | remove snow from airport operational areas

Schnee auf Betriebsflächen des Flughafens beseitigen
IN-CONTEXT TRANSLATIONS
9. Calls on the Commission and the Member States to pay particular attention to planning and review sustainable land use policies, ecosystem absorption capacities and best practices in the light of the increased risk of flooding stemming from the way in which land, habitats and drainage systems are managed; also calls on the Commission to increase the capacity of flood-control and drainage infrastructure in order to limit the dama ...[+++]

9. fordert die Kommission und die Mitgliedstaaten auf, der Planung und Überprüfung einer nachhaltigen Flächennutzungspolitik, der Aufnahmefähigkeit von Ökosystemen und der bewährten Praxis angesichts der höheren Überschwemmungsrisiken, die durch die Art der Bewirtschaftung von Böden, Lebensräumen und Entwässerungsanlagen entstehen, besondere Aufmerksamkeit zu widmen; fordert die Kommission ferner auf, die Kapazitäten im Bereich des Hochwasserschutzes und der Entwässerung auszubauen, um durch extreme Niederschlagsmengen verursachte Schäden einzudämmen; betont, dass ein wirksamer Hochwasserschutz auf grenzüberschreitenden Strategien beru ...[+++]


5. Calls on the Commission and the Member States to pay particular attention to planning and reviewing sustainable land use policies, ecosystem absorption capacities and best practices and to increasing the capacity of flood-control and drainage systems;

5. fordert die Kommission und die Mitgliedstaaten auf, der Planung und Überprüfung einer nachhaltigen Flächennutzungspolitik, der Aufnahmefähigkeit von Ökosystemen und der bewährten Praxis sowie dem Ausbau der Kapazitäten im Bereich des Hochwasserschutzes und der Entwässerung besondere Aufmerksamkeit zu widmen;


12. Calls on the Commission and the Member States to review planning, sustainable land use policies, ecosystem absorption capacities and best practice in the light of the increased risks of flooding stemming from the way land, habitats and drainage systems are managed, and to increase the capacity of flood-control and drainage infrastructure in order to limit the damage caused by extreme rainfall;

12. fordert die Kommission und die Mitgliedstaaten auf, Planung, nachhaltige Flächennutzungspolitik, Ökosystem-Aufnahmefähigkeit und bewährte Verfahren angesichts der größeren Überschwemmungsrisiken durch die Art der Bewirtschaftung von Böden, Lebensräumen und Einzugsgebieten zu überdenken und die Möglichkeiten des Hochwasserschutzes und der Infrastruktur für Entwässerung auszuweiten, um die Schäden bei extremen Niederschlagsmengen einzudämmen;


4. Calls on the Commission and the Member States to review planning, sustainable land use policies, ecosystem absorption capacities and best practices in the light of the increased risks of flooding stemming from the way land, habitats and drainage systems are managed and to increase the capacity of flood-control and drainage infrastructure in order to limit the damage caused by extreme rainfall;

4. fordert die Kommission und die Mitgliedstaaten auf, Planung, nachhaltige Flächennutzungspolitik, Ökosystem-Aufnahmefähigkeit und bewährte Verfahren angesichts der höheren Überschwemmungsrisiken durch die Art der Bewirtschaftung von Böden, Lebensräumen und Einzugsgebieten zu überdenken und die Möglichkeiten des Hochwasserschutzes und von Entwässerungssystemen auszuweiten, um die Schäden bei extremen Niederschlagsmengen einzudämmen;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
4. Calls on the Commission and the Member States to review planning, sustainable land use policies, ecosystem absorption capacities and best practices in the light of the increased risks of flooding stemming from the way land, habitats and drainage systems are managed and to increase the capacity of flood-control and drainage infrastructure in order to limit the damage caused by extreme rainfall;

4. fordert die Kommission und die Mitgliedstaaten auf, Planung, nachhaltige Flächennutzungspolitik, Ökosystem-Aufnahmefähigkeit und bewährte Verfahren angesichts der höheren Überschwemmungsrisiken durch die Art der Bewirtschaftung von Böden, Lebensräumen und Einzugsgebieten zu überdenken und die Möglichkeiten des Hochwasserschutzes und von Entwässerungssystemen auszuweiten, um die Schäden bei extremen Niederschlagsmengen einzudämmen;


Flood risk management plans may also include the promotion of sustainable land use practices, improvement of water retention as well as the controlled flooding of certain areas in the case of a flood event.

Die Unterstützung nachhaltiger Flächennutzungsmethoden, die Verbesserung des Wasserrückhalts und kontrollierte Überflutungen bestimmter Gebiete im Falle eines Hochwasserereignisses können ebenfalls in die Hochwasserrisikomanagementpläne einbezogen werden.


a summary of the measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management, including the measures taken in accordance with Article 7, and flood related measures taken under other Community acts, including Council Directives 85/337/EEC of 27 June 1985 on the assessment of the effects of certain public and private projects on the environment and 96/82/EC of 9 December 1996 on the control of major accident hazards involving dangerous substances , Directive 2001/42/EC of the European Parliame ...[+++]

Zusammenfassung der Maßnahmen und deren Rangfolge, die auf die Verwirklichung der angemessenen Ziele des Hochwasserrisikomanagements abzielen, einschließlich der gemäß Artikel 7 ergriffenen Maßnahmen, und der im Rahmen anderer Gemeinschaftsrechtsakte, einschließlich der Richtlinie 85/337/EWG des Rates vom 27. Juni 1985 über die Umweltverträglichkeitsprüfung bei bestimmten öffentlichen und privaten Projekten , der Richtlinie 96/82/EG des Rates vom 9. Dezember 1996 zur Beherrschung der Gefahren bei schweren Unfällen mit gefährlichen Stoffen , der Richtlinie 2001/42/EG des Europäischen Parlaments und des Rates vom 27. Juni 2001 über die ...[+++]


Flood risk management plans may also include the promotion of sustainable land use practices, improvement of water retention as well as the controlled flooding of certain areas in the case of a flood event.

Die Unterstützung nachhaltiger Flächennutzungsmethoden, die Verbesserung des Wasserrückhalts und kontrollierte Überflutungen bestimmter Gebiete im Falle eines Hochwasserereignisses können ebenfalls in die Hochwasserrisikomanagementpläne einbezogen werden.


a summary of the measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management, including the measures taken in accordance with Article 7, and flood related measures taken under other Community acts, including Council Directives 85/337/EEC of 27 June 1985 on the assessment of the effects of certain public and private projects on the environment (1) and 96/82/EC of 9 December 1996 on the control of major accident hazards involving dangerous substances (2), Directive 2001/42/EC of the European P ...[+++]

Zusammenfassung der Maßnahmen und deren Rangfolge, die auf die Verwirklichung der angemessenen Ziele des Hochwasserrisikomanagements abzielen, einschließlich der gemäß Artikel 7 ergriffenen Maßnahmen, und der im Rahmen anderer Gemeinschaftsrechtsakte, einschließlich der Richtlinie 85/337/EWG des Rates vom 27. Juni 1985 über die Umweltverträglichkeitsprüfung bei bestimmten öffentlichen und privaten Projekten (1), der Richtlinie 96/82/EG des Rates vom 9. Dezember 1996 zur Beherrschung der Gefahren bei schweren Unfällen mit gefährlichen Stoffen (2), der Richtlinie 2001/42/EG des Europäischen Parlaments und des Rates vom 27. Juni 2001 übe ...[+++]


Cooperation now also includes important EC projects in flood control (following the 1987 and 1988 floods and the Mitterand initiative in support of a major Flood Action Plan), as well as cyclone protection (after the 1991 April cyclone).

Die Entwicklungszusammenarbeit erstreckt sich nunmehr auch auf umfangreiche EG-geförderte Projekte im Bereich der Hochwasserkontrolle (Anlaß dazu gaben die Überschwemmungskatastrophen von 1987 und 1988 sowie die Mitterand- Initiative zur Unterstützung eines umfassenden Aktionsplans zur Hochwasserkontrolle) und im Bereich des Wirbelsturmschutzes (Anlaß war der Wirbelsturm vom April 1991).


w