The liabilities regarding the liquidity pool of the
Land (measure 3), a loan of EUR [.] granted by Bank für Tirol und Vorarlberg AG to CMHN (47), a
loan of EUR [.]
granted by Kreissparkasse Ahrweiler to MSR (48) and the
loans of RIM to MSR worth EUR 85 512 000,
granted in the form of the silent participations of RIM in Mediinvest and subsequent
loans of Mediinvest to MSR (measure 11) were restructured in one
loan of EUR 325 265 000 given by ISB to NG, MSR and CMHN, upon an
...[+++] instruction by the Land (49).